Lac du Bonnet Bridge reopens today

ldb-bridge.jpg
A photo taken last week of construction on the bridge. (Cynthia Chevrefils)

Manitoba Infrastructure has advised the RM that the re-opening of the Winnipeg River bridge over PR 313 is on track for Friday, December 14 at 5:00 pm.   The North lane will be opened to single lane traffic operated by traffic lights.